Conducting industrial environmental monitoring by climatic seasons at the Al-Farabi field in the middle part
of the Kazakhstan sector of the Caspian Sea
Conducting industrial environmental monitoring at IGI engineering and geological surveys and engineering hydrometeorological surveys before the construction of the V-1 exploratory well at the Zhenis filed in the middle part of the Kazakhstan sector of the Caspian Sea
Development of an environmental impact assessment (EIA) project for the "Project for the elimination of the consequences of subsurface use in the Zhemchuzhina project area in the northern part of the Kazakhstan sector of the Caspian Sea»
Development of an environmental impact assessment (EIA) project for the working project "Multifunctional marine terminal "Sarzha". Vertical layout and formation of the territory" in the Mangystau region
Development of an environmental impact assessment project "EIA" for a local project for the extraction of building stone (granodiorites) at the Almaly site in the Karaganda region.
Development/support in the approval of the Project for the establishment of water protection zones and strips for Lake Taldykol and the group of lakes Maly Taldykol
Development/support in the approval of the Project for the establishment of water protection zones and strips of the Nura-Yesil canal at the construction site of gas stations